Downloads
Overview Search Downloads Submit file Up
Download details
P-040-2020 Sri. Nandakumar. N, Kollam-Order 04-02-2021
The appellant having a connected load of 20 kilowatts and a contract demand of 22.222 kVA in ToD billing. The electric connection was availed for running a cashew factory and the tariff allotted is LT IVA. The appellant received monthly electricity bill for the consumption in January 2020 for Rs.15,867/- plus Rs.54/- towards the surcharge for the delay in remitting the previous bill. The appellant challenged the bill in CGRF, Kottarakkara vide OP No.22/2020, but the Forum dismissed the petition, observing no abnormality in the bill and the consumption recorded in the meter is actual. Aappellant filed appeal petition on 03-12-2020. From the analysis done and the conclusions arrived at, the appeal petition No. P040/2020 filed by the appellant stands dismissed as it is found having no merits. The order dated 07-09-2020 in OP No. 22/2020 of CGRF, Kottarakkara is upheld. No interest or surcharge shall be collected from the appellant for the appeal period and the period of petition pending before CGRF.

Data

Size 173.31 KB
Downloads 820
Created 2021-03-08 08:55:18

Download