Downloads
Overview Search Downloads Submit file Up
Download details
P-032-2020-Smt. Roshini Riju - Order 03-02-2021
The Petition filed by the appellant seeking to pass an order directing the respondent to remove the cross bars and overhead 1IKV electric transmission lines and other lines from the property of the appellant within a time bound manner. It is because of the visible infringement of electric transmission lines and cross bars encroached into the property of the appellant. The respondent is directed to initiate suitable action to remove the lines and cross arms from the property of the appellant by doing suitable rearrangement of 11 KV and LT cross arms or by shifting the ‘A’ type single steel pole in the same side of the road or by constructing a double pole structure in the same side of the road. The respondent can opt any of the suggestions, which is more economical and more technically feasible without obstructing the movements of vehicles and people through the roads. The expenses for the said work shall be met by the Licensee. The order of CGRF dated 30-09-2020 in OP No.14/2020-21 is set aside.

Data

Size 163.58 KB
Downloads 841
Created 2021-04-08 11:17:19

Download