Downloads
Overview Search Downloads Submit file Up
Download details
P/102/2019 Smt. Binny Mathew Kottayam
The appellant had applied to provide an electric connection for agricultural purpose in her property vide application number 2156321900177 on 04-07-2019. The Sub Engineer assessed Rs 44000/- as estimate to draw the line through two nearby property owners who issued consent. Another property owner had not issued consent to draw the line through the pathway owned by him, but the Assistant Executive Engineer, Erattupetta had decided to draw the line through the pathway only and directed the Assistant Engineer and Sub Engineer to prepare the estimate for the line through the pathway. Accordingly, the appellant was issued a demand note for Rs. 1,10,442/- on 19-09-2019. Aggrieved by this, the appellant had approached the CGRF, Kottarakkara by filing a petition in OP No. 103/2019. The Forum allowed the petition and directed the respondent to draw the line through the route as suggested by the respondent firstly, Aggrieved against the non implementation of the order by the respondent, the appellant has submitted this appeal petition before this Authority on 23-12-2019. The appellant approached the Kerala State Electricity Regulatory Commission seeking implementation of orders of CGRF, Kottarakkara and hence it is not required to issue any orders by this Authority. However, from the analysis done above and the conclusions arrived at, it is directed the respondent to look into the possibility of drawing LT Aerial Bunched Cable (ABC) through the proposed or any other convenient route without or minimising cutting trees or branches of trees and the respondent shall prepare an estimate and inform to the appellant within a period of 15 days from the date of this order. Having concluded and decided as above, it is ordered accordingly. No order on costs.

Data

Size 89.68 KB
Downloads 1130
Created 2020-03-02 04:41:24

Download