The appellant Shri. Iqbal. M is the Director of M/s. Malabar Realtors Pvt.Ltd. and this firm is an HT consumer (LCN : 12/3875) of Licensee KSEBL under their Electrical Section, Central. The agreement authority is the Dy. Chief Engineer, Kozhikode and billing is done by SOR, KSEBL. The tariff applicable to this connection is HT IV B commercial with contract demand 200 KVA. This connection was effected on 12/08/2002. The energy meter (ToD meter ) was defective during 08/2022 and the consumer informed the Licensee. The meter was tested and declared faulty by letter dated 19/09/2022. The consumer has been asked to replace the meter and CT/PT unit. The appellant has purchased the meter and accessories and tested the same at the TMR lab Kannur. The testing was completed on 31/10/2022 and meter was handed over to the Section. The clearance of HT panel with the wall was not sufficient and hence the shifting of panel was necessitated. On completing the shifting the meter has been installed and commissioned only on 22/10/2022. The replacement of meter was delayed beyond two months and hence the Licensee had applied meter fault penality for Rs. 6,49,840/-. The consumer requested for the waiver of the penalty as he had procured the meter & accessories well within the time.The claim of the consumer has not been agreed by the Licensee and then he filed the petition to CGRF. CGRF issued order dated 24/01/2025. This petition is filed as an appeal to the CGRF order. |
|
Data
|
Size |
197.15 KB |
Downloads |
1 |
Created |
2025-06-09 07:35:47 |

|
|