The appellant T.Surendran is the owner of M/s.Sreekrishna Oil Mills situated at Ulloor - Akkalam road at Trivandrum. He has availed a 3 phase power connection from the Licensee for operating this oil mill. The consumer number is 1145170002261 with connected load 48.642 KW and contract demand 40 KVA under LT 4 A tariff. The connection was effected on 31/08/1970. The APTs and Section Squad had conducted an inspection on 25/11/2024 and two anomalies were detected at the premises. 1. The voltage terminals of R phase was connected to the Y phase. 2. The current terminals of CT of Y phase is connected to B phase and that of B phase is connected to the Y phase. Due to the wrong connection the meter was reading less than the actual power consumed. The Licensee has connected a test meter parellelly and found that meter is reading 76.32 % less than the actual power consumption. The consumer requested for a load enhancement for 13 KW to 48.642 KW which necessitated the meter change with CT and the same was effected on 01/08/2022. The short assessment bill have been served to the appellant amounting to Rs. 5,25,356/- for a period with effect from 08/2022. The appellant challenged the demand and filed the petition to CGRF. CGRF on completing the procedures, issued order on 28/03/2025. This petition is filed to this authority as an appeal to the CGRF Order. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 4703 |
![]() | All | 7246715 |
P/045/2025, M/s. Nano Plast |
06-10-2025 |
P/049/2025, Sri. Shaji.T |
06-10-2025 |
P/047/2025, Sri. Sudheer Kumar P.K |
06-10-2025 |
P/048/2025, Sri. Sujithchandran |
06-10-2025 |
P/046/2025, Sri. Baby Paul |
06-10-2025 |
P/044/2025, Sri. Anurag Sharma |
06-10-2025 |
P/043/2025, Sri.Sajikumar. M.B |
06-10-2025 |
P/042/2025, Dr.Thembamoodu Sahadevan |
01-09-2025 |
RP/05/2025, The Assistant Executive Engineer |
01-09-2025 |
RP/04/2025,The Assistant Executive Engineer |
01-09-2025 |